Skip to content

Recommended System Configuration

At minimum, CLM runs on a single Windows server, with the bundled PostgreSQL database on the same machine. For production, the recommended setup adds a separate database server, plus optional servers for high availability and reporting.

It is installed using the Securden Unified PAM installation package and activated with a Certificate Lifecycle Management licence. If you also license the NHI Security Platform, both run on the same servers.

Certificate discovery is agentless. The platform scans servers and websites over the network, so you do not install anything on the systems it scans. Certificate deployment also needs no agent: it uses OpenSSH Server on the target system.

SaaS deployments: Securden hosts and manages the servers. To discover certificates on systems inside your network and deploy certificates to them, a remote connector must be installed in that network. The remote connector is not required for on-premises deployments.

Solution Components

Component Role Required
Primary application server Hosts the web console and core services: certificate discovery, issuance and renewal, expiry tracking, deployment, reports and audit trails. Yes
Secondary application server Takes over if the primary server fails (high availability). Optional
Primary database Stores the certificate inventory, private keys (encrypted), certificate authority settings and audit trails. Bundled PostgreSQL by default; Microsoft SQL Server optional Yes
Secondary database Continuously copies data from the primary database. Optional
Read-only replica server A copy of the data used for reporting, so reports do not slow down the primary server. Optional
Remote connector Connects Securden's cloud to systems inside the customer's network, for certificate discovery and deployment. SaaS only

With two application servers connected to one database, the platform stays available if one server fails: the load balancer sends users to the other server. The two servers can be separate physical machines or two virtual machines on one host.

Server Requirements (Production)

Any physical or virtual server that meets the configuration below works.

Unit Primary server Secondary server Database server
Memory 16 GB RAM 16 GB RAM 16 GB RAM
Disk 50 GB or more 50 GB or more 50 GB or more
Virtual CPU (Intel or AMD) 4 or more cores 4 or more cores 4 or more cores
Operating system Windows Server 2016 or above Windows Server 2016 or above Windows Server 2016 or above
IP address 1 static IP 1 static IP 1 static IP
Quantity 1 1 or more 1
Purpose Core CLM server High availability Backend database (bundled PostgreSQL, or Microsoft SQL Server)
  • Each server needs a Windows Server licence.
  • The database grows with the number of certificates managed.

Client Access

Users open the web console in Chrome, Edge, Firefox or Safari.